Angololo Multipurpose Water Resources Development Project
The project comprises of construction of a dam and water storage reservoir, development of irrigated agriculture, water supply and sanitation, as well as a system for flow regulation to control floods and manage drought situations. The project objectives are to:
Alleviate poverty in the project area by transforming existing subsistence farming
Increase resilience and adaptability to climate change by promotion of alternative livelihoods
Improve water supply and sanitation.
Reverse environmental degradation through the implementation of sustainable land management
Intensify economic activities in the project area by opening-up agro-processing facilities
Strengthen trans-boundary cooperation between Uganda and Kenya
Project Status
Feasibility Stage started in July 2020 and should be completed since
2022. Therefore, project has started Project Structuring stage (S3A)
Financial needs
Funding required in the short-term for Project Structuring (0.5 Mn
USD) and Transaction Support & Financial Close (0.35 Mn USD),
for a total of 0.85 Mn USD
Private sector opportunities
Project has potential to be suitable for a PPP scheme with both
involved countries having proper PPP regulatory framework and
track record of projects in the water sector
The project comprises of construction of a dam and water storage reservoir, development of irrigated agriculture, water supply and sanitation, as well as a system for flow regulation to control floods and manage drought situations. The project objectives are to:
Alleviate poverty in the project area by transforming existing subsistence farming
Increase resilience and adaptability to climate change by promotion of alternative livelihoods
Improve water supply and sanitation.
Reverse environmental degradation through the implementation of sustainable land management
Intensify economic activities in the project area by opening-up agro-processing facilities
Strengthen trans-boundary cooperation between Uganda and Kenya
Project Status
Feasibility Stage started in July 2020 and should be completed since
2022. Therefore, project has started Project Structuring stage (S3A)
Financial needs
Funding required in the short-term for Project Structuring (0.5 Mn
USD) and Transaction Support & Financial Close (0.35 Mn USD),
for a total of 0.85 Mn USD
Private sector opportunities
Project has potential to be suitable for a PPP scheme with both
involved countries having proper PPP regulatory framework and
track record of projects in the water sector